The above detail from Bonacci Group is the construction process which I have selected for the major assignment. It shows a universal column with base plate attached to a pad which is located on the perimeter wall of the warehouse. It also shows the slab and reinforcement method that would be used. My model and poster are based on this detail.
Posted by Simma at 11:00 PM
Labels: Construction Process Selected

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Simma's Construction Blog

Simma's Construction Blog

Blog Archive

  • ▼  2007 (23)
    • ▼  May (19)
      • Finished Model
      • Finished Poster
      • Construction weakens, despite lift in house buildi...
      • New Building Permits Drop To Slowest Pace In A Decade
      • Government counting on green homes to cut emissions
      • Labor won't tolerate anarchy on construction sites
      • Impressive Water Conservation at Boral Roof Tile P...
      • Green hero takes shape
      • Whitegoods Warehouse
      • Flatman's Timber Yard
      • Qanstruct Constructions Warehouse Project
      • Spencer Street DFO
      • Glen Waverley Medical Consulting Suite
      • AXA / Grocon Site
      • Building and Construction Links
      • Bovis Lend Lease, C3 C4 Site Visit
      • Construction Process Selected
      • Structrual Engineers Drawings
      • Fabricators Shop Drawings
    • ►  April (1)
    • ►  March (3)

About Me

Simma
Student Number: 600 111 328
View my complete profile