skip to main | skip to sidebar

Tuesday, May 29, 2007

Finished Model






Posted by Simma at 4:21 AM
Labels: Finished Model

1 comment:

Anonymous said...

Hello. This post is likeable, and your blog is very interesting, congratulations :-). I will add in my blogroll =). If possible gives a last there on my blog, it is about the TV de LCD, I hope you enjoy. The address is http://tv-lcd.blogspot.com. A hug.

March 16, 2008 at 5:55 PM

Post a Comment

Older Post Home
Subscribe to: Post Comments (Atom)

Simma's Construction Blog

Simma's Construction Blog

Blog Archive

  • ▼  2007 (23)
    • ▼  May (19)
      • Finished Model
      • Finished Poster
      • Construction weakens, despite lift in house buildi...
      • New Building Permits Drop To Slowest Pace In A Decade
      • Government counting on green homes to cut emissions
      • Labor won't tolerate anarchy on construction sites
      • Impressive Water Conservation at Boral Roof Tile P...
      • Green hero takes shape
      • Whitegoods Warehouse
      • Flatman's Timber Yard
      • Qanstruct Constructions Warehouse Project
      • Spencer Street DFO
      • Glen Waverley Medical Consulting Suite
      • AXA / Grocon Site
      • Building and Construction Links
      • Bovis Lend Lease, C3 C4 Site Visit
      • Construction Process Selected
      • Structrual Engineers Drawings
      • Fabricators Shop Drawings
    • ►  April (1)
    • ►  March (3)

About Me

Simma
Student Number: 600 111 328
View my complete profile